Medical Treatment Center
Design Build Medical Treatment Center for Forward Operating Site, Bulgaria.
Disciplines:
Mechanical
Electrical
Plumbing
Details:
Under a design build contract, the Medical Treatment Center for the Bulgaria base will require HVAC Systems for the communications and treatment rooms to comply with the United States ASHRAE design guide for Patient Care Facilities. Spaces that require heating only will utilize electric heaters to meet the space heating requirement and will be controlled by an integral thermostat. Fluorescent, direct lighting and emergency lighting will be provided as well as grounding counterpoise and a lightning protection system. A telecommunications structured support and cabling system will be provided in the facility with a Nurse Call system consisting of patient station cordsets, dome lights, master station annunciator, equipment panel and cables. The facility will meet Anti Terrorism Force Protection (ATFP) requirements.
